iPDF Pro Life EN 12350-1 EBOOK

EN 12350-1 EBOOK

Find the most up-to-date version of CEN – EN at Engineering Testing fresh concrete – Part 1: Sampling – SS-EN This European Standard specifies two procedures for sampling fresh concrete, by composite. 1 Apr This British Standard specifies two procedures for sampling fresh concrete which are implemented by composite sampling and by spot.

Author: Fegami Arajind
Country: Philippines
Language: English (Spanish)
Genre: Life
Published (Last): 26 December 2016
Pages: 431
PDF File Size: 20.92 Mb
ePub File Size: 20.49 Mb
ISBN: 140-5-26542-383-2
Downloads: 81684
Price: Free* [*Free Regsitration Required]
Uploader: Shakasho

The standard is now in your shopping cart. Fill the mold in three layers of approximately equal height. Significance and Use The slump en 12350-1 was originally developed to provide a technique to monitor the consistency of unhardened concrete.

Create a website or blog at WordPress. You may find similar items within these categories by selecting from the choices below:. The faster, easier way to work with standards. Record the temperature to the nearest 0. Contents of BS EN en 12350-1 After this, the design mix specific to the particular type of structure recommends the discharge time limit waived against what is stated in the specifications.

Please download Chrome or Firefox or view our browser tips. Both parties will agree to the specific time limit en 12350-1 substantiated from the concrete design mix.

Disregard the first part and the last part of the load and take at least 4 increments. After compaction of each layer, tap the sides of the container en 12350-1 with the mallet until large bubbles of air cease to appear on the surface and depressions left by the compacting en 12350-1 or bar, are removed.

BS EN 12350-1:2009

Where required, the specification of a maximum time between placing layers of concrete should take account of the likely temperature of the concrete, cement type, mix proportions, the use of admixtures with set retarding properties and consistency en 12350-1 the concrete. En 12350-1 the load is discharged, sampling should be taken from the whole width and depth not just en 12350-1 top part. SS-EN Concrete pipes and fittings, unreinforced, steel fibre and reinforced.

Ways of how the sample shall be vibrated: Ensure that the compacting rod, or bar, does not forcibly strike the bottom of the mould when compacting the first layer, nor penetrate significantly any previous layer. Marking The test en 12350-1 shall be marked clearly and indelibly, without damaging the specimen using a cub tag that contains the information related to the specimen Casting date, ticket number, specimen ID, location of sampling….

The elapsed time shall not exceed 15 min. Compaction of the concrete The en 12350-1 shall be compacted immediately after placing in the moulds in such a way as to produce full compaction of the concrete with neither excessive segregation nor laitance.

This website is best viewed with browser version of up to Microsoft Internet Explorer 8 or Firefox 3. Shopping cart 1235-01 cart 0, foreach: Subscribe on en 12350-1 with our subscription service.

Testing fresh concrete – Part 1: Sampling

This British Standard specifies two procedures en 12350-1 sampling fresh concrete which are implemented by composite sampling and by en 12350-1 sampling. Take the smart route to manage medical device compliance. Sampling Concrete It is acceptable to measure the temperature in: Each sample shall be accompanied by a report from the person responsible for taking the sample. Extended delays in placing can lead en 12350-1 a significant loss of consistency with time making it impossible to place with satisfactory compaction.

See more standards on testing concrete. Thank you for another wonderful post. Boverkets handbok om betongkonstruktioner, BBK In the case of self-compacting concrete, the mould shall be filled in one operation and no mechanical compaction shall be applied during filling or after the mould is filled. While the spot sampling takes scoopfuls en 12350-1 the initial discharge of the concrete from en 12350-1 truck mixer.

Leave the TMD in the concrete a minimum of 2 min. Procedure en 12350-1 Slump Test Ej being readied for en 12350-1 test activity Fill the mold in three layers of approximately equal height. Scope This standard covers the determination of the en 12350-1 of freshly mixed hydraulic-cement concrete.

You may experience issues viewing this site in Internet Explorer 9, 10 or Sampling, conformity control and evaluation of conformity.

Subject the concrete to a sufficient number of strokes per layer, typically 123550-1 The requirement for remixing the sample before tests on the en 12350-1 concrete, or before making test specimens, is included in the relevant standards.

Sampling of Freshly Mixed Concrete at the Field (BS EN ) – QA/QC Construction

rn Composite samples are not required if the only purpose of obtaining the sample is to determine the temperature. Sampling BS EN specifies two procedures en 12350-1 sampling fresh concrete, by composite sampling and by spot sampling. There is often debate about the time limit between placing fresh concrete against fresh ej already placed and compacted i.

Rod the en 12350-1 and top layers throughout their depth, so that the strokes just penetrate into the immediately underlying layer.

By continuing to use this website, you agree to their use. Testing fresh concrete – En 12350-1 1: Compacting by hand with compacting rod or bar Distribute the strokes in a uniform manner over the cross-section of the mould.